Ring the yard07448 856 620
Plant hire · Etruria

Site Generator hire
Stoke-on-Trent

The thing that makes a plot with no supply workable.

5.0 from 31 Google reviews

Output
5 kVA
Supply
110V and 240V
Run time
5 to 8 hrs
Hire type
Dry hire
Elite Tool & Plant Hire petrol site generator

A 5 kVA petrol generator with both 110V and 240V outlets, so site tools and mains kit run off the same machine. On a plot with no supply yet, in a field, or on a job where the power is going off for the day, this is the difference between working and standing about.

The pairing that matters most in our yard is this and the electric breaker, which is site voltage and needs feeding. If you are taking up concrete anywhere without a socket, the two go out together, or you take the petrol breaker and leave this behind.

Getting it to the job

It is a carry-it-in machine rather than a gate-width one, so there is no access width to work out. The thing to plan is where it stands once it gets there.

A car boot takes it. It wants to travel upright and the fuel wants to be secured separately, not rolling round in the footwell.

The numbers

Site Generator
specification

Output0kVA
Supply0V and 240V
Run time0to 8 hrs

Getting it to the job

Carried in by hand, so access is not the question it is with the plant.

It still has to get to site: collect it from the yard in Etruria, or we will run it out with the rest of your hire.

The rest of the sheet

Hire type
Dry hire
Getting it there
Collect or delivered

Ring the yard if a figure matters to your job and we will check it against the machine before you travel.

What comes with it

  • Serviced and tested between every hire
  • A 110V to 240V converter plug, fuelled and running
  • Delivery to site, or collect it from the Etruria yard
  • Off hire from the day you ring, not the day it comes back

What you will need

  • Somewhere outdoors and open to stand it
  • The right leads for what you are plugging in
  • Fuel for a long day, and somewhere safe to keep it
Dry hireCollect or deliveredServiced between hiresSame day when we have it
What people hire it for

The jobs it actually
gets used on

Six of the jobs the site generator goes out on most. Keep scrolling and they stack.

01/ 06

Running the breaker

The electric breaker is site voltage. On a plot or a drive with no supply, this is what feeds it, and the two are usually hired together.

02/ 06

New builds and empty plots

Before the supply is connected, everything on site runs off a generator. Tools, lights, a kettle if you are lucky.

03/ 06

Fields, paddocks and land away from a building

Fencing, gates, pumping and anything else out of reach of a socket, which out in the Cheshire and Staffordshire countryside is most of it.

04/ 06

Power cuts and planned shutdowns

Keeping the essentials going through a planned outage or while the supply is being worked on.

05/ 06

Outdoor events and marquees

Lighting and small power somewhere with no mains, where a quiet corner out of the wet is all it needs.

06/ 06

Running the water pump

A flooded trench in the middle of nowhere needs both the pump and something to run it. Same answer.

How it works

Hiring the site generator
start to finish

01

Ring, message or send the details

Tell us the job and the dates. We will say whether it is in, when it is back if it is out, and whether it is the right machine for what you are doing.

02

Collect it, or we run it out

Pick it up from the yard on Brick Kiln Lane in Etruria, or we will deliver it to site. If you ring early enough and it is free, it can often go out the same day.

03

Ring when you are done

We off hire it from the day you ring rather than the day it happens to come back, and collect it from site if we delivered it.

Before you book

What you
need to know

Elite Tool & Plant Hire petrol site generator
Site Generator, in the yard on Brick Kiln Lane, Etruria.
01

Outside, always

Never in a garage, a shed, a tent or any enclosed space, and not up against a doorway or an open window either. Exhaust fumes from a petrol engine kill people indoors, and they do it without warning.

02

Work out the load before you hire

Add up what you are actually plugging in, and remember motors pull far more on start-up than they do running. Ring and tell us what the tools are rather than guessing at the numbers.

03

110V and 240V are not interchangeable

Site tools are 110V with a yellow plug, ordinary tools are 240V with a blue or a three pin. Use the right outlet and the right lead, and do not improvise an adaptor.

04

Keep it dry and keep it level

Standing water and electricity are a bad combination. Level ground, out of the rain if you can manage it, and not in a puddle that is about to become a pond.

05

Fuel it cold

Shut it down and let it cool before you top it up. Petrol onto a hot exhaust is the mistake that makes the news.

06

Need it today

Often one we can get straight out, but ring ahead so we can check rather than you turning up on the off chance.

From the Google profile

Spot on guys, good price and delivered on time. Machine performed as expected. Would certainly use again.

Jonathan Chapman · Delivered to site

Used Elite for the first time after using other companies before, wow what a breath of fresh air, prompt replies to messages, Cameron dropped the micro digger off and what a credit to the company he is…

Neil Gerrard · Micro digger
Collect or delivered

Where the site generator
goes out to

The yard is on Brick Kiln Lane in Etruria, a couple of minutes off the A500, so most of Stoke-on-Trent and Newcastle-under-Lyme is a short run either way. Collect it yourself if you have something that can carry or tow it, or we will deliver it to site and collect it when you are finished.

Map of Stoke-on-Trent showing the Elite Tool & Plant Hire yard at Etruria

© MapTiler © OpenStreetMap

Etruria yard against the six towns and Newcastle.
Asked most often

Site Generator hire,
answered

A couple of tools at once rather than a whole site. The thing that catches people out is start-up current, which is far higher than running current on anything with a motor. Tell us the actual tools when you ring and we will tell you whether it copes.

Yes, and that is one of the main reasons people hire it. The two go out together often enough that we will usually ask whether you want both, or whether the petrol breaker suits you better.

No. It runs outdoors only, and not next to an open door or window either. Petrol exhaust in an enclosed space is genuinely dangerous, not a technicality.

Around eight hours, though that depends entirely on what you have plugged into it. Plan for topping up on a long day and let it cool first.

Get it booked

Tell us the job.
We will tell you the machine.

Ring the yard and you get a straight answer on whether the site generator is available, when it is back if it is out on hire, and whether it is the right thing for what you are doing. If it is not, we will say so.